HEALTH & SAFETY INFORMATION
Prior to commencing any works on site a detailed site investigation is carried out to assess all potential risks and hazards.
A site specific works method statement is then produced which outlines in detail :
- The procedures involved in establishing and removing the nets:
- guidance notes for the client to enable them to familiarise themselves with:
– general recommendations for the installation and use of safety nets
– the role of the contractor, or main contractor
– the role of our company in establishing and removing the net system
– agents likely to damage the nets
– site inspection ie: checking that nets are rigged correctly
When the nets have been installed and inspected by our team and a handover certificate completed by our certified rigger, the client can then commence works above the safe area of the net.
A project specific Health and Safety Manual is also prepared prior to rigging of nets, the manual including the following :
- Company Health and Safety Policy
- Company structure and Personnel
- Identification of Specific Work Areas in which the Nets are Installed
- Hazard Register / Analysis of Specific Work Areas
- Personal Safety Equipment Registers
- Serious Harm Flow Chart identifying Procedures to be Followed in the Event of Serious Harm Accident
- Investigation Flow Chart
- Site Specific Induction Form
All of our safety documentation has been produced in such a format as to ensure that it complements the overall site safety policy and manual that the Principal Contractor is required to establish on all projects.
CONSTRUCTION INDUSTRY
- we provide safety nets to construction site
- portable toilets and shower facilities
EVENT INDUSTRY
- running a major event no problem
- planning a small family get together no problem
- sporting events are our specialty – motorcar rally – equestrian – triathlon- we do it all
- not for profit organisations – call us we are here to help – school ag day – anniversary days